F-gas check sheet for EU web shops selling heat pumps, air conditioners and fridges: the 1 January 2027 bans on R-32 monoblock and split air-to-water units up to 12 kW, the old-stock evidence rule, product page GWP details and installer proof under F-gas Regulation (EU) 2024/573, for accountants, bookkeepers and web agencies
What you get: a finished F-gas check sheet for EU web shops that sell heat pumps, air conditioners, chillers, fridges and freezers. One row per product line. You fill short answers from the product page, the label and the purchase files, and the formulas return the GWP (from Annex I, Annex VI or the label), the tonnes of CO2 equivalent, the Annex IV point and prohibition date with the days left, a sale status (new stock banned from a date, old stock, evidence needed, stop), what the product page must add under Article 12(16), whether you need proof of an F-gas certificate holder as installer before the sale (Article 11(7)), a to-do list with the Article behind each line and a result (OK, PREPARE BY [date], KEEP PROOF BY [date], GET PROOF, FIX PAGE OR CHECKOUT, STOP SELLING, CHECK BY HAND, FIX INPUT or NOT AN F-GAS). Also included: an Annex VI mixture calculator, a supplier request and a client email. We tested the formulas in LibreOffice on seventeen made-up product lines, at two dates, before publishing.
Short answer: from 1 January 2027, 52 days from 10 November 2026, Annex IV of Regulation (EU) 2024/573 bans placing on the EU market plug-in, monoblock and other self-contained air conditioners and heat pumps up to 12 kW (point 8(b)) and split air-to-water heat pumps up to 12 kW (point 9(b)) that contain fluorinated greenhouse gases with a GWP of 150 or more. R-32 has a GWP of 675 (Annex I), so R-32 monoblock and split air-to-water units are caught unless a safety exception applies. Stock already placed on the market before that date may still be sold, but from 1 January 2028 only “if evidence is provided” that it was placed on the market before the date (Article 11(1)). Product pages for units with a GWP of 150 or more must already give the F-gas label information (Article 12(16)).
Partner programme opening soon: join the free waitlist. Planned terms are 50% of each referred sale (75% once you have 5+ paying customers), single level, paid through Gumroad only from revenue received.
Why accountants, bookkeepers and web agencies should look at this now
- Stock bought in December can become hard to sell. The ban follows the date a unit was first placed on the EU market (Article 3(6)), not the date the shop sells it. Units the importer releases in January 2027 cannot be sold, so a shop needs the supplier's dates for its stock.
- The evidence rule hits old stock one year later. From 1 January 2028 the shop must be able to show that each R-32 monoblock it sells was placed on the market before 1 January 2027 (Article 11(1)). Purchase invoices and supplier confirmations sit with the bookkeeper.
- Product pages are part of it. Article 12(16) puts the label information (contains fluorinated greenhouse gases, gas designation, kg and CO2 equivalent, GWP) into “descriptions used for advertising” for GWP 150 or more. Web agencies maintain those pages.
- Split systems need an installer. Non-hermetically sealed equipment may only be sold to an end user with evidence that the installer holds an F-gas certificate under Article 10 (our paraphrase) and will install it (Article 11(7)).
- It pairs with our energy label sheet for web shops and our product safety page sheet.
Step 1: list the product lines (scraper, free during launch)
- Run the Shopify & WooCommerce Product + Price Tracker on each client shop. It returns products, prices, variants and SKU/GTIN from independent Shopify, WooCommerce and schema.org shops, and skips shops whose robots.txt or terms forbid scraping. You pay only your own Apify usage costs.
- Filter the titles and descriptions for words like heat pump, Wärmepumpe, pompe à chaleur, monoblock, split, air conditioner, Klimagerät, climatiseur, portable AC, chiller, fridge, freezer, R32, R-32, R410A, R290, kW. Copy each match to columns B and C.
- The scraper does not decide the gas or the date. Take the type, capacity, refrigerant, GWP and charge from the label or data sheet (Article 12(3) puts them on the label), and the placing-on-the-market date from the supplier.
- Need the suppliers' or manufacturers' contacts to send the request below? The Website Contact Scraper returns emails (MX-checked), phones and social profiles from their websites, one de-duplicated row per site.
Annex IV dates for the products web shops sell
| Point | Products | Gas | From |
|---|---|---|---|
| 2(a) | Domestic fridges and freezers | HFCs, GWP 150+ | 1 Jan 2015 |
| 2(b) | Domestic fridges and freezers | Any F-gas, unless needed for safety at the site | 1 Jan 2026 |
| 7(b) / 7(c) | Chillers up to 12 kW | GWP 150+ / any F-gas | 1 Jan 2027 / 1 Jan 2032 |
| 7(d) | Chillers above 12 kW | GWP 750+ (wording corrected by the 2025 corrigendum) | 1 Jan 2027 |
| 8(a) | Plug-in room AC movable between rooms | HFCs, GWP 150+ | 1 Jan 2020 |
| 8(b) / 8(c) | Plug-in, monoblock and other self-contained AC and heat pumps up to 12 kW | GWP 150+ / any F-gas | 1 Jan 2027 / 1 Jan 2032 |
| 8(d) | Monoblock and other self-contained AC and heat pumps above 12 kW up to 50 kW | GWP 150+ | 1 Jan 2027 |
| 8(e) | Other self-contained AC and heat pumps | GWP 150+ | 1 Jan 2030 |
| 9(a) | Single split systems with less than 3 kg of gas | GWP 750+ | 1 Jan 2025 |
| 9(b) | Split air-to-water up to 12 kW | GWP 150+ | 1 Jan 2027 |
| 9(c) | Split air-to-air up to 12 kW | GWP 150+ | 1 Jan 2029 |
| 9(d) | Split systems up to 12 kW | Any F-gas | 1 Jan 2035 |
| 9(e) / 9(f) | Split systems above 12 kW | GWP 750+ / GWP 150+ | 1 Jan 2029 / 1 Jan 2033 |
Points 8 and 9 (except 8(a) and 9(a)) and 7(b) to 7(d) carry an exception “if required to meet safety requirements at the site of operation”; such units must say so on the label (Article 12(15)). Fixed double duct units count as split (Annex IV, footnote to point 9). Two Commission exemptions apply from 1 January 2027: compressed air refrigerated dryers under points 7(b), 8(b) and 8(d) until 31 December 2030 (Implementing Regulation (EU) 2026/1975) and chillers for semiconductor manufacturing under points 7(b) and 7(d) until 31 December 2029 (Implementing Regulation (EU) 2026/286), both only with the Article 12(2) label.
Step 2: the sheet, one row per product line (columns A to AE)
Create a tab called Products. Row 1 holds the headers below; paste the formulas into U2 to AE2 and fill down. Add four small tabs: Settings (B1 today, =TODAY(); B2 = 2027-01-01; B3 = B2-B1 days left), Gases, Points and Mix, with the tables further down. Type the answers exactly as shown. The formulas use IF, AND, OR, LEFT, MID, UPPER, TRIM, SUBSTITUTE, VLOOKUP, MATCH, IFERROR, EDATE, TEXT and TEXTJOIN (Excel 2019 or later, Microsoft 365, Google Sheets, LibreOffice). The binary .xlsx is kept in our working copy only (we publish text files); rebuild it from the formulas below.
| Col | What goes in it | Based on |
|---|---|---|
| A–C | Shop, product page URL, product title | Product scraper |
| D | Equipment type: PLUG-IN AC, SELF-CONTAINED AC OR HEAT PUMP (monoblock, window, through-wall), SPLIT AIR-TO-WATER, SPLIT AIR-TO-AIR (incl. fixed double duct), CHILLER, DOMESTIC FRIDGE OR FREEZER or OTHER | Annex IV |
| E | Maximum rated capacity in kW (not needed for fridges) | Label or data sheet |
| F | Single split (one outdoor and one indoor unit)? Y/N (split only) | Annex IV 9(a) |
| G | Refrigerant designation, e.g. R-32, R-290, R-410A | Label, Art 12(3)(b) |
| H | GWP on the label or data sheet (leave blank for gases in the Gases tab) | Art 12(3)(c) |
| I | Gas type: HFC, OTHER F-GAS or NOT F-GAS (leave blank for gases in the Gases tab; a mixture containing any HFC is HFC) | Art 3(4), Annex I, II |
| J | Charge in kg | Label, Art 12(3)(c) |
| K | Exemption or safety case claimed: NONE, SAFETY, CARD, SEMICONDUCTOR or OTHER | Annex IV; Art 11(5); 2026/286; 2026/1975 |
| L | Date the units were first placed on the EU market (from the supplier; blank if unknown) | Art 3(6), 11(1) |
| M | Proof of that date on file? Y/N | Art 11(1) |
| N | Hermetically sealed? Y/N | Art 3(9), 11(7) |
| O | Installer proof collected at sale? Y, N or NOT SOLD TO END USERS | Art 11(7) |
| P–S | Product page says it contains fluorinated greenhouse gases / gives the designation / gives kg and t CO2e / gives the GWP? Y/N each | Art 12(3), 12(16) |
| T | Notes | You |
| U–X | Gas key, GWP used, gas type used, t CO2e | Annex I, II, VI; Art 3(3) |
| Y–Z | Annex IV point and prohibition date | Annex IV |
| AA | Sale status | Art 11(1) |
| AB | Product page status, naming each missing item with the numbers to add | Art 12(16) |
| AC | Installer proof status | Art 11(7) |
| AD | To-do list with Article cites | As cited |
| AE | Result | Summary |
Gases tab (columns A key, B GWP, C gas type; key = designation in capitals without spaces or hyphens): R32 675 HFC; R125 3500 HFC; R134A 1430 HFC; R143A 4470 HFC; R152A 124 HFC; R227EA 3220 HFC; R23 14800 HFC (Annex I, Section 1); R1234YF 0.501 OTHER F-GAS; R1234ZE 1.37 OTHER F-GAS (Annex II, Section 1); SF6 24300 OTHER F-GAS (Annex I, Section 3); R290 0.02, R600 0.006, R600A 0, R170 0.437 NOT F-GAS (Annex VI); R744 (carbon dioxide) 1 NOT F-GAS (GWP is measured relative to CO2, Article 3(1)). Mixtures such as R-410A or R-454B: use the GWP on the label, or work it out in the Mix tab.
Points tab (A point, B date): the dates in the Annex IV table above, one row per point: 2(a) 2015-01-01, 2(b) 2026-01-01, 7(a) 2020-01-01, 7(b) 2027-01-01, 7(c) 2032-01-01, 7(d) 2027-01-01, 8(a) 2020-01-01, 8(b) 2027-01-01, 8(c) 2032-01-01, 8(d) 2027-01-01, 8(e) 2030-01-01, 9(a) 2025-01-01, 9(b) 2027-01-01, 9(c) 2029-01-01, 9(d) 2035-01-01, 9(e) 2029-01-01, 9(f) 2033-01-01. Point 7(a) (chillers, HFCs with GWP 2500 or more, 1 January 2020) excludes equipment cooling below –50 °C; the sheet does not ask about that.
Mix tab (Annex VI): one row per component with the weight share (B, as a fraction) and the GWP (C); D6 = ROUND(SUMPRODUCT(B2:B5,C2:C5),1). Annex VI's own example (60% dimethyl ether at GWP 1, 10% HFC-152a at 124, 30% isobutane at 0) gives 13.0, and so does the sheet.
Formulas (row 2; fill down). In Excel files saved by some tools TEXTJOIN shows as _xlfn.TEXTJOIN; that is the same function.
U2: =IF(G2="","",SUBSTITUTE(SUBSTITUTE(UPPER(TRIM(G2))," ",""),"-",""))
V2: =IF(A2="","",IF(ISNUMBER(H2),H2,IFERROR(VLOOKUP(U2,Gases!$A$2:$C$40,2,0),"")))
W2: =IF(A2="","",IF(I2<>"",UPPER(I2),IFERROR(VLOOKUP(U2,Gases!$A$2:$C$40,3,0),"UNKNOWN")))
X2: =IF(A2="","",IF(AND(OR(W2="HFC",W2="OTHER F-GAS"),ISNUMBER(V2),ISNUMBER(J2)),ROUND(J2*V2/1000,3),""))
Y2: =IF(A2="","",IF(OR(NOT(OR(W2="HFC",W2="OTHER F-GAS")),NOT(ISNUMBER(V2))),"",IF(D2="PLUG-IN AC",IF(AND(W2="HFC",V2>=150),"8(a)",IF(E2<=12,IF(V2>=150,"8(b)","8(c)"),IF(E2<=50,IF(V2>=150,"8(d)","NONE"),IF(V2>=150,"8(e)","NONE")))),IF(D2="SELF-CONTAINED AC OR HEAT PUMP",IF(E2<=12,IF(V2>=150,"8(b)","8(c)"),IF(E2<=50,IF(V2>=150,"8(d)","NONE"),IF(V2>=150,"8(e)","NONE"))),IF(OR(D2="SPLIT AIR-TO-WATER",D2="SPLIT AIR-TO-AIR"),IF(AND(F2="Y",ISNUMBER(J2),J2<3,V2>=750),"9(a)",IF(E2<=12,IF(V2>=150,IF(D2="SPLIT AIR-TO-WATER","9(b)","9(c)"),"9(d)"),IF(V2>=750,"9(e)",IF(V2>=150,"9(f)","NONE")))),IF(D2="CHILLER",IF(AND(W2="HFC",V2>=2500),"7(a)",IF(E2<=12,IF(V2>=150,"7(b)","7(c)"),IF(V2>=750,"7(d)","NONE"))),IF(D2="DOMESTIC FRIDGE OR FREEZER",IF(AND(W2="HFC",V2>=150),"2(a)","2(b)"),"OTHER")))))))
Z2: =IF(OR(Y2="",Y2="NONE",Y2="OTHER"),"",VLOOKUP(Y2,Points!$A$2:$B$30,2,0))
AA2: =IF(A2="","",IF(ISNA(MATCH(D2,{"PLUG-IN AC","SELF-CONTAINED AC OR HEAT PUMP","SPLIT AIR-TO-WATER","SPLIT AIR-TO-AIR","CHILLER","DOMESTIC FRIDGE OR FREEZER","OTHER"},0)),"FIX: EQUIPMENT TYPE MUST BE ONE OF THE SEVEN CODES (D)",IF(W2="UNKNOWN","FIX: REFRIGERANT NOT IN THE GASES TAB: ENTER GWP (H) AND GAS TYPE (I) FROM THE LABEL",IF(AND(W2<>"NOT F-GAS",NOT(ISNUMBER(V2))),"FIX: ENTER THE GWP FROM THE LABEL (H)",IF(W2="NOT F-GAS","NOT AN F-GAS: NO ANNEX IV BAN, NO F-GAS LABEL",IF(AND(D2<>"DOMESTIC FRIDGE OR FREEZER",D2<>"OTHER",NOT(ISNUMBER(E2))),"FIX: ENTER THE MAXIMUM RATED CAPACITY IN KW (E)",IF(AND(LEFT(D2,5)="SPLIT",F2<>"Y",F2<>"N"),"FIX: SINGLE SPLIT Y OR N (F)",IF(NOT(ISNUMBER(J2)),"FIX: ENTER THE CHARGE IN KG (J)",IF(AND(N2<>"Y",N2<>"N"),"FIX: HERMETICALLY SEALED Y OR N (N)",IF(D2="OTHER","CHECK BY HAND: PRODUCT TYPE NOT COVERED BY THIS SHEET; READ ANNEX IV",IF(AND(K2<>"",K2<>"NONE"),"CHECK BY HAND: EXEMPTION OR SAFETY CASE ("&K2&"): READ THE IMPLEMENTING ACT OR SAFETY STANDARD AND CHECK THE ART 12(2) OR 12(15) LABEL",IF(Y2="NONE","NO ANNEX IV DATE FOR THESE INPUTS",IF(L2="",IF(Z2>Settings!$B$1,"BAN FROM "&TEXT(Z2,"YYYY-MM-DD")&" ("&(Z2-Settings!$B$1)&" DAYS, ANNEX IV POINT "&Y2&"): UNITS PLACED ON THE EU MARKET FROM THAT DATE MAY NOT BE SOLD; ASK THE SUPPLIER WHEN YOUR STOCK WAS PLACED ON THE MARKET","BANNED SINCE "&TEXT(Z2,"YYYY-MM-DD")&" (ANNEX IV POINT "&Y2&"): SELL ONLY UNITS PLACED ON THE EU MARKET BEFORE THAT DATE, WITH PROOF"),IF(L2>=Z2,"STOP: PLACED ON THE EU MARKET ON OR AFTER "&TEXT(Z2,"YYYY-MM-DD")&" (ANNEX IV POINT "&Y2&"); MAY NOT BE SUPPLIED OR MADE AVAILABLE (ART 11(1))",IF(M2="Y","OK: PLACED BEFORE "&TEXT(Z2,"YYYY-MM-DD")&" (ANNEX IV POINT "&Y2&") AND PROOF ON FILE",IF(Settings!$B$1>=EDATE(Z2,12),"EVIDENCE NEEDED: SINCE "&TEXT(EDATE(Z2,12),"YYYY-MM-DD")&" OLD STOCK MAY BE SUPPLIED ONLY WITH EVIDENCE THAT IT WAS PLACED ON THE MARKET BEFORE "&TEXT(Z2,"YYYY-MM-DD")&" (ART 11(1))","OLD STOCK: PLACED BEFORE "&TEXT(Z2,"YYYY-MM-DD")&" (ANNEX IV POINT "&Y2&"); FROM "&TEXT(EDATE(Z2,12),"YYYY-MM-DD")&" SUPPLY ONLY WITH EVIDENCE OF THAT (ART 11(1))"))))))))))))))))
AB2: =IF(A2="","",IF(OR(NOT(OR(W2="HFC",W2="OTHER F-GAS")),NOT(ISNUMBER(V2))),"",IF(V2<150,"GWP UNDER 150: ART 12(16) ADVERTISING TEXT NOT REQUIRED; LABEL AND MANUAL STILL NEEDED",IF(AND(P2="Y",Q2="Y",R2="Y",S2="Y"),"OK","ADD TO THE PRODUCT PAGE (ART 12(16)): "&TEXTJOIN(", ",TRUE,IF(P2<>"Y","CONTAINS FLUORINATED GREENHOUSE GASES",""),IF(Q2<>"Y","DESIGNATION "&UPPER(G2),""),IF(R2<>"Y",IF(ISNUMBER(X2),J2&" KG = "&X2&" T CO2E","QUANTITY IN KG AND T CO2E"),""),IF(S2<>"Y","GWP "&V2,""))))))
AC2: =IF(A2="","",IF(NOT(OR(W2="HFC",W2="OTHER F-GAS")),"",IF(N2="Y","HERMETICALLY SEALED: ART 11(7) DOES NOT APPLY",IF(N2<>"N","",IF(OR(O2="Y",O2="NOT SOLD TO END USERS"),"OK","COLLECT PROOF THAT AN INSTALLER WITH AN F-GAS CERTIFICATE (ART 10) WILL INSTALL IT BEFORE SELLING TO AN END USER (ART 11(7))")))))
AD2: =IF(A2="","",TEXTJOIN("; ",TRUE,IF(LEFT(AA2,3)="FIX","Fix input: "&MID(AA2,6,200),""),IF(LEFT(AA2,4)="STOP","Take the listing offline and stop supplying these units; ask the supplier (Art 11(1))",""),IF(LEFT(AA2,5)="CHECK","Check by hand: "&MID(AA2,16,250),""),IF(OR(LEFT(AA2,6)="BANNED",LEFT(AA2,8)="EVIDENCE"),"Get written proof from the supplier of the date the units were placed on the EU market (Art 11(1))",""),IF(LEFT(AA2,8)="BAN FROM","Before "&TEXT(Z2,"YYYY-MM-DD")&": count units in stock, ask the supplier for the placing-on-the-market date and plan a model with GWP under 150",""),IF(LEFT(AA2,9)="OLD STOCK","File the supplier proof before "&TEXT(EDATE(Z2,12),"YYYY-MM-DD"),""),IF(LEFT(AB2,3)="ADD",AB2,""),IF(LEFT(AC2,7)="COLLECT","Add an installer field at checkout and keep the proof (Art 11(7))","")))
AE2: =IF(A2="","",IF(LEFT(AA2,3)="FIX","FIX INPUT",IF(LEFT(AA2,4)="STOP","STOP SELLING",IF(LEFT(AA2,5)="CHECK","CHECK BY HAND",IF(OR(LEFT(AA2,6)="BANNED",LEFT(AA2,8)="EVIDENCE"),"GET PROOF",IF(OR(LEFT(AB2,3)="ADD",LEFT(AC2,7)="COLLECT"),"FIX PAGE OR CHECKOUT",IF(LEFT(AA2,8)="BAN FROM","PREPARE BY "&TEXT(Z2,"YYYY-MM-DD"),IF(LEFT(AA2,9)="OLD STOCK","KEEP PROOF BY "&TEXT(EDATE(Z2,12),"YYYY-MM-DD"),IF(LEFT(AA2,6)="NOT AN","NOT AN F-GAS","OK")))))))))
What we tested
Seventeen made-up product lines in LibreOffice (xlsx → ods → csv), first with today fixed at 10 Nov 2026 (52 days to 1 Jan 2027), then at 15 Jan 2028: an R-290 portable AC and an R-290 monoblock and an R-600a fridge (NOT AN F-GAS); an R-32 portable AC (banned since 2020 under 8(a): GET PROOF); an 8 kW R-32 monoblock with no supplier date and an R-454B monoblock with GWP 466 from the label (PREPARE BY 2027-01-01, then GET PROOF); an R-32 split air-to-water unit placed on the market in September 2026 without installer proof (FIX PAGE OR CHECKOUT, then GET PROOF); an R-32 split air conditioner whose page lacks kg and CO2e (FIX PAGE OR CHECKOUT, ban 2029); an R-410A single split with dated proof (OK at both dates); a compressed air dryer claiming the exemption and an R-134a dehumidifier (CHECK BY HAND); a 20 kW R-32 rooftop unit delivered in February 2027 (STOP SELLING); an R-134a fridge (GET PROOF); an unknown refrigerant and a split with no capacity (FIX INPUT); an R-32 monoblock old stock whose page lacks the GWP (FIX PAGE OR CHECKOUT, then GET PROOF); and an R-32 monoblock placed in October 2026 with a complete page (KEEP PROOF BY 2028-01-01, then GET PROOF). 17/17 gave the intended result at both dates, the empty row stayed blank, the Mix tab gave 13.0, and no cell showed an error.
Supplier request (template)
Subject: F-gas Regulation: placing-on-the-market dates for our stock Hello, From 1 January 2027 the units below may no longer be placed on the EU market if they contain fluorinated greenhouse gases with a GWP of 150 or more (Regulation (EU) 2024/573, Annex IV points 8(b), 8(d), 9(b)). Units placed on the market before that date may still be sold, but from 1 January 2028 only with evidence of that (Article 11(1)). For each item please send: 1. The date the units we bought were first placed on the EU market (customs release for free circulation or first supply in the EU). 2. A document showing that date (invoice, delivery note or customs reference). 3. The refrigerant, charge in kg, GWP and t CO2e from the label. 4. Whether a safety exception or Commission exemption is claimed. Items: [list with SKU, serial or batch numbers] Thank you, [Name], [Shop]
Client email
Subject: Your heat pumps and air conditioners: F-gas dates from 1 January 2027 Hello, We checked [number] product lines in your shop against the F-gas Regulation (EU) 2024/573: - [number] lines use R-32 or another gas with GWP 150+ and fall under the 1 January 2027 ban (monoblock and split air-to-water up to 12 kW) - Stock placed on the EU market before that date can still be sold; from 1 January 2028 only with proof of the date (Article 11(1)) - [number] product pages lack the F-gas details (Article 12(16)) - [number] split systems need proof of an F-gas certificate holder as installer before sale to an end user (Article 11(7)) The attached sheet lists each line and the fix. We prepared a request you can send to your suppliers. Best regards, [Name]
Limits and our reading
- National law decides penalties and enforcement (Article 31). We did not read national laws, Commission guidance or FAQs, the implementing act on the label format (Article 12(17)), or the Commission proposal listed on EUR-Lex as amending this Regulation, which is not adopted law.
- Our reading, flagged: we treat a web shop product description as a “description used for advertising” (Article 12(16)); “single split” in point 9(a) is not defined, so you answer it in column F; a mixture containing any HFC is treated as an HFC for points 2(a), 7(a) and 8(a) (Article 3(4)); any safety or exemption claim is CHECK BY HAND; capacity is the maximum rated capacity as the label states it.
- Not covered: leak checks, records and recovery for installed equipment (Articles 4 to 8), certification content (Article 10), gas purchase and bulk sales rules (Article 11(6) and 11(8)), HFC quotas, pre-charged equipment and the F-gas Portal (Articles 16 to 21; importers of pre-charged equipment should read Article 19), refillable containers (Article 11(3)–(4)), foams, aerosols and personal care products (Annex IV points 16 to 21), imports, exports and trade controls (Articles 22 and 23), and energy labels and ecodesign.
- The scraper gives dated product data only. It does not decide whether a product line complies.
FAQ
What changes for heat pumps and air conditioners on 1 January 2027?
Under Annex IV of Regulation (EU) 2024/573, from 1 January 2027 these may no longer be placed on the EU market if they contain fluorinated greenhouse gases with a GWP of 150 or more: plug-in, monoblock and other self-contained air conditioners and heat pumps up to and including 12 kW (point 8(b)), self-contained units above 12 kW up to 50 kW (point 8(d)), split air-to-water systems up to 12 kW (point 9(b)) and chillers up to 12 kW (point 7(b)). Chillers above 12 kW with a GWP of 750 or more follow on the same date (point 7(d)). Each point has an exception where safety requirements at the site of operation require it.
Can a web shop still sell R-32 units it already has in stock?
Yes, if the units were placed on the EU market before the prohibition date. The ban is on placing on the market, which Article 3(6) defines as the customs release for free circulation or supplying or making available in the Union for the first time. Article 11(1) adds that from one year after the date in Annex IV, units placed on the market before it may be supplied only if evidence is provided that they were placed lawfully before that date. For the 1 January 2027 bans that means from 1 January 2028. Units placed on the market unlawfully after the date may not be supplied at all.
What must the product page say?
Article 12(16) says the label information must also be included in descriptions used for advertising for products and equipment containing fluorinated greenhouse gases with a GWP of 150 or more. Under Article 12(3) that is an indication that the product contains fluorinated greenhouse gases, the industry designation of the gas, the quantity in weight and in CO2 equivalent, and the GWP. We read a web shop product description as a description used for advertising; the Regulation does not mention web shops by name.
What is the GWP of R-32, and how do I work out t CO2e?
Annex I gives HFC-32 a GWP of 675 and HFC-134a 1430. For mixtures, Annex VI gives the method: a weighted average of the weight shares times the GWP of each substance. Tonnes of CO2 equivalent are the weight of gas in tonnes times its GWP (Article 3(3)), so 1.5 kg of R-32 is 0.0015 x 675 = 1.013 t CO2e.
Does a split air conditioner need an installer with an F-gas certificate?
Article 11(7) says non-hermetically sealed equipment charged with fluorinated greenhouse gases may only be sold to an end user where evidence is provided that the installation is to be carried out by an undertaking holding a certificate under Article 10 (our paraphrase of the wording). Most split systems are joined on site, so the shop should collect that evidence before the sale, for example with an installer field at checkout.
Are propane (R-290) heat pumps affected?
Propane is not a fluorinated greenhouse gas: Annex VI lists it with a GWP of 0.02 as a non-fluorinated substance. Annex IV and the F-gas label rules in Article 12 do not apply to it. Other rules (product safety, energy labels, installation standards) still do.
Sources (read 10 Nov 2026 on EUR-Lex)
- Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014, OJ L, 2024/573, 20.2.2024 (CELEX 32024R0573): Articles 3, 11, 12 and 38, Annexes I, II, IV and VI; the EUR-Lex document page (amendments, derogations, corrigenda).
- Corrigendum to Regulation (EU) 2024/573, OJ L, 2025/90271, 24.3.2025 (CELEX 32024R0573R(05)): points 4 (Article 12(1)) and 14 (Annex IV point 7(d)).
- Commission Implementing Regulation (EU) 2026/1975 of 8 September 2026 (compressed air refrigerated dryers), OJ L, 9.9.2026 (CELEX 32026R1975): recitals 1–7, Articles 1–2.
- Commission Implementing Regulation (EU) 2026/286 of 10 February 2026 (chillers for semiconductor manufacturing) (CELEX 32026R0286): Articles 1–2.
- Product and contact scraper features: Apify Store pages and the public Apify API, read 10 Nov 2026.
Related
- Energy label check sheet for web shops
- Product safety product-page check sheet (GPSR Article 19)
- Battery check sheet for EU web shops
- EUDR check sheet for EU web shops
- Supplier quote request sheet
- Website legal notice check sheet
Unadhi Guides are free, independent explainers. We correct errors as soon as we find them: write to mininglife7@gmail.com.